Issue format

A soloscrum Issue is the durable record of intent — what to achieve and the conditions under which it is considered done. It is referenced from PRs, commits, and later decisions; it is not a container for execution steps, progress, or evidence. Those live in PRs, commits, branches, CI runs, and tracker labels.

The “no How” rule on titles and the “outcome, not implementation” rule on AC both follow from this — they are not stylistic choices.

Two layers exist. A parent Issue carries intent (the why, the success condition, the scope boundary). A Subtask carries a slice of work that delivers part of that intent. They use different body formats.

A candidate is its own Issue when both hold:

  1. Self-contained, independently checkable outcome. Its “done” can be evaluated on its own terms — either user-facing behavior or a structural / contract / capability milestone (e.g. “the auth module exposes this contract and its tests pass,” “a signed build artefact is produced”).
  2. Not merely a delivery slice of an existing intent. No larger intent — already filed or currently being refined — already owns the “why” that the candidate just slices.

If either fails → the candidate is a Subtask of the parent intent.

Tie-breaker for condition 2: when a plausibly-parent open Issue already exists, default to Subtask unless its “why” clearly does not subsume the candidate. The default biases toward smaller, intent-coherent units; promote to a sibling Issue only when the candidate carries its own independent “why.”

The boundary is relational, not fixed. The same piece of work can be an Issue in one context (pre-release foundational work with no parent intent yet) and a Subtask in another (post-release, where it slices a user-facing feature). Release state, project maturity, and the surrounding intent landscape all shift what passes condition 2.

A parent Issue body is always written in this order:

## Background
[Why this feature is needed.]
## Goal
[State the objective in 1-2 sentences.]
## Acceptance Criteria
- [ ] [Verifiable outcome — Shape A or Shape B; see below.]
## Out of Scope
- [Explicitly state what is excluded. Write "None" if nothing.]
## Notes
[Supplementary info, references, design links.]

Title rules:

  • Starts with a verb
  • 50 characters or fewer
  • Describes the What, not the How

The same title rules apply to Subtasks — still verb-first, still What not How.

AC takes one of two shapes, picked per Issue:

  • Shape A — user-facing behavior. user can log in with email, error message is shown on invalid input, login no longer crashes on empty input. Use for product features and observable changes — including absence / no-regression outcomes phrased as “X no longer happens.”
  • Shape B — structural / contract / capability. auth module exposes verify(token) returning {valid, expiry}, build pipeline produces a signed release artefact, legacy /v1/login endpoint no longer registered (returns 404). Use for foundational, infrastructure, or pre-release work where no user surface exists yet, where the outcome is best expressed as a contract, or for removal / deprecation outcomes (absence of a contract).

Both shapes describe a verifiable state, not a procedure. Mixing both within one Issue is allowed when the Issue legitimately spans both surfaces.

A leading <!-- soloscrum-issue-format --> HTML comment plus a small italic footer mark the body as soloscrum-formatted, so the janitor and /validate can detect it cheaply.

Subtasks do not carry their own Background / Goal / Acceptance Criteria / Out of Scope — those belong to the parent. A Subtask body is intentionally light:

Parent: #<parent-issue-number>
## What
[One sentence describing the slice — what part of the parent's intent this delivers.]
## Checklist
- [ ] [Concrete step toward the slice]
- [ ] [Another step]
## Notes
[Optional: design points, dependencies on other Subtasks, references.]

A Subtask’s done condition is concrete: the slice lands an artefact the parent’s AC verifiably depends on, or strictly advances the parent’s AC checklist count, without regressions. A pure spike that does not feed back into the parent’s AC is not done at the parent’s level even when its own PR lands cleanly. The intent-level AC sign-off itself happens at the parent Issue when all of its Subtasks are closed — not necessarily the chronologically last Subtask PR, since dependency ordering can put logically-last work earlier.

  • /refine writes parent Issues in the intent body shape.
  • /breakdown produces Subtasks in the lighter work body shape.
  • /validate checks an existing Issue against the intent body before /breakdown runs.
  • You read the body any time you triage, estimate, or pick up an Issue or Subtask.

templates/ISSUE_TEMPLATE.md mirrors the four-section intent body. Subtasks do not use the template — they are created via /breakdown. Use the template in one of two ways:

  • Copy it into .github/ISSUE_TEMPLATE/ so GitHub’s “New Issue” UI offers it as a chooser entry.
  • Paste it manually into a fresh Issue body in the GitHub web UI.

The canonical language is English. Multi-language variants are out of scope.